
Consumer Insights
Uncover trends and behaviors shaping consumer choices today
Procurement Insights
Optimize your sourcing strategy with key market data
Industry Stats
Stay ahead with the latest trends and market analysis.
The Philippines data centre construction market reached around USD 271.60 Million in 2024. The market is projected to grow at a CAGR of 11.80% between 2025 and 2034 to reach USD 828.61 Million by 2034.
Base Year
Historical Period
Forecast Period
The average adoption rate of digital technologies like IoT (47%) is substantially higher in the Philippines than in ROW.
Data centres based in the Philippines draw 94MW of energy for their various operations.
The digitalisation of data centre construction processes is expected to improve resource efficiency by 53%.
Value in USD Million
2025-2034
Philippines Data Centre Construction Market Outlook
*this image is indicative*
Philippines Data Centre Construction Market Report Summary | Description | Value |
Base Year | USD Million | 2024 |
Historical Period | USD Million | 2018-2024 |
Forecast Period | USD Million | 2025-2034 |
Market Size 2024 | USD Million | 271.60 |
Market Size 2034 | USD Million | 828.61 |
CAGR 2018-2024 | Percentage | XX% |
CAGR 2025-2034 | Percentage | 11.80% |
CAGR 2025-2034 - Market by End Use | IT and Telecom | 13.2% |
CAGR 2025-2034 - Market by Size | Small and Medium-Size Data Center | 12.4% |
2024 Market Share by End Use | IT and Telecom | XX% |
The increasing focus on speed and creativity in modern data centres has expedited the demand for prefabricated data centre buildings, which lower construction costs by 10%-30% while reducing waste generation and energy consumption. For constructing hyperscale data centres, a hybrid approach of traditional building and construction of prefabricated modules is expected to become popular, due to its cost-effectiveness and quick completion time.
Digital project management platforms, big data analytics, and traditional building information modelling systems are expected to transform the market. Extended reality (58%) and artificial intelligence and machine learning (59%) are expected to witness widespread adoption among data centre construction companies in the Philippines, which can aid in optimum resource allocation, project scheduling, and site safety monitoring.
Advancements in the field of quantum computing are expected to accelerate the energy requirements of upcoming data centres over the forecast period. This is expected to prompt companies to deploy small-size nuclear power reactors, and other renewable energy sources like wind and solar power to ensure that high electricity requirements are met sustainably without compromising on the performance of data centre equipment. Data centre construction companies are expected to play a key role in driving sustainable change in the market.
Philippines Data Centre Construction Market Report and Forecast 2025-2034 offers a detailed analysis of the market based on the following segments:
Market Breakup by Infrastructure
Market Breakup by Size
Market Breakup by Tier Type
Market Breakup by End Use
CAGR 2025-2034 - Market by | Size |
Small and Medium-Size Data Center | 12.4% |
Large Data Center | XX% |
CAGR 2025-2034 - Market by | End Use |
IT and Telecom | 13.2% |
BFSI | 12.3% |
Government and Defense | XX% |
Healthcare | XX% |
Others | XX% |
Based on end use, the market is segmented into BFSI, IT and telecom, government and defence, and healthcare, among others. Over the forecast period, IT and Telecom and BFSI are expected to grow at a CAGR of 13.2% and 12.3% respectively.
Major data centre construction companies in the Philippines are boosting their investments in the adoption of digital technologies, to reduce their reliance on human labour, enhance productivity, and handle multiple construction projects simultaneously.
Philippines Data Centre Construction Market Size
Philippines Data Centre Construction Market Growth
*While we strive to always give you current and accurate information, the numbers depicted on the website are indicative and may differ from the actual numbers in the main report. At Expert Market Research, we aim to bring you the latest insights and trends in the market. Using our analyses and forecasts, stakeholders can understand the market dynamics, navigate challenges, and capitalize on opportunities to make data-driven strategic decisions.*
Get in touch with us for a customized solution tailored to your unique requirements and save upto 35%!
The market reached nearly USD 271.60 Million in 2024.
The market is projected to grow at a CAGR of 11.80% between 2025 and 2034.
The market is assessed to witness healthy growth in the forecast period to reach around USD 828.61 Million in 2034.
The different segments based on infrastructure include electrical, mechanical, and general.
The different sizes of data centres in the market are small and medium-size data centres and large-size data centres.
The different segments based on tier type considered in the market report are tier I and II, tier III, and tier IV.
The different end uses of data centre construction are BFSI, IT and telecom, government and defence, and healthcare, among others.
The key market players are AECOM, EdgeConneX, Inc., Fujitsu Ltd., NTT Ltd., Schneider Electric SE, Megawide Construction Corporation, Space DC Pte Ltd., Vertiv Holdings Co., and DataOne, among others.
Explore our key highlights of the report and gain a concise overview of key findings, trends, and actionable insights that will empower your strategic decisions.
REPORT FEATURES | DETAILS |
Base Year | 2024 |
Historical Period | 2018-2024 |
Forecast Period | 2025-2034 |
Scope of the Report |
Historical and Forecast Trends, Industry Drivers and Constraints, Historical and Forecast Market Analysis by Segment:
|
Breakup by Infrastructure |
|
Breakup by Size |
|
Breakup by Tier Type |
|
Breakup by End Use |
|
Market Dynamics |
|
Competitive Landscape |
|
Companies Covered |
|
Single User License
One User
USD 3,999
USD 3,599
tax inclusive*
Datasheet
One User
USD 2,499
USD 2,249
tax inclusive*
Five User License
Five User
USD 4,999
USD 4,249
tax inclusive*
Corporate License
Unlimited Users
USD 5,999
USD 5,099
tax inclusive*
*Please note that the prices mentioned below are starting prices for each bundle type. Kindly contact our team for further details.*
Flash Bundle
Small Business Bundle
Growth Bundle
Enterprise Bundle
*Please note that the prices mentioned below are starting prices for each bundle type. Kindly contact our team for further details.*
Flash Bundle
Number of Reports: 3
20%
tax inclusive*
Small Business Bundle
Number of Reports: 5
25%
tax inclusive*
Growth Bundle
Number of Reports: 8
30%
tax inclusive*
Enterprise Bundle
Number of Reports: 10
35%
tax inclusive*
How To Order
Our step-by-step guide will help you select, purchase, and access your reports swiftly, ensuring you get the information that drives your decisions, right when you need it.
Select License Type
Choose the right license for your needs and access rights.
Click on ‘Buy Now’
Add the report to your cart with one click and proceed to register.
Select Mode of Payment
Choose a payment option for a secure checkout. You will be redirected accordingly.
Track prices with detailed trend reports.
Analyse trade data for supply chain insights.
Leverage cost reports for smart savings
Enhance supply chain with partnerships.
Gain insights to stay ahead and seize opportunities.
Get insights & trends for a competitive edge.
Track prices with detailed trend reports.
Analyse trade data for supply chain insights.
Leverage cost reports for smart savings
Enhance supply chain with partnerships.
Gain insights to stay ahead and seize opportunities.
Get insights & trends for a competitive edge.
Track prices with detailed trend reports.
Analyse trade data for supply chain insights.
Connect For More Information
Our expert team of analysts will offer full support and resolve any queries regarding the report, before and after the purchase.
Our expert team of analysts will offer full support and resolve any queries regarding the report, before and after the purchase.
We employ meticulous research methods, blending advanced analytics and expert insights to deliver accurate, actionable industry intelligence, staying ahead of competitors.
Our skilled analysts offer unparalleled competitive advantage with detailed insights on current and emerging markets, ensuring your strategic edge.
We offer an in-depth yet simplified presentation of industry insights and analysis to meet your specific requirements effectively.
Australia
63 Fiona Drive, Tamworth, NSW
+61-448-061-727
India
C130 Sector 2 Noida, Uttar Pradesh 201301
+91-723-689-1189
Philippines
40th Floor, PBCom Tower, 6795 Ayala Avenue Cor V.A Rufino St. Makati City,1226.
+63-287-899-028, +63-967-048-3306
United Kingdom
6 Gardner Place, Becketts Close, Feltham TW14 0BX, Greater London
+44-753-713-2163
United States
30 North Gould Street, Sheridan, WY 82801
+1-415-325-5166
Vietnam
193/26/4 St.no.6, Ward Binh Hung Hoa, Binh Tan District, Ho Chi Minh City
+84-865-399-124
United States (Head Office)
30 North Gould Street, Sheridan, WY 82801
+1-415-325-5166
Australia
63 Fiona Drive, Tamworth, NSW
+61-448-061-727
India
C130 Sector 2 Noida, Uttar Pradesh 201301
+91-723-689-1189
Philippines
40th Floor, PBCom Tower, 6795 Ayala Avenue Cor V.A Rufino St. Makati City, 1226.
+63-287-899-028, +63-967-048-3306
United Kingdom
6 Gardner Place, Becketts Close, Feltham TW14 0BX, Greater London
+44-753-713-2163
Vietnam
193/26/4 St.no.6, Ward Binh Hung Hoa, Binh Tan District, Ho Chi Minh City
+84-865-399-124
Share